Donate Now
News

March Trail Work Report

March’s trail work day was a success.  We were able to cut and clear the 42” diameter doug fir that had fallen across Oak Ridge Trail.  We also rerouted the trail so when the doug fir leaner falls, it hopefully won’t block the trail. Thanks to all that helped make the work day a success!

Remember next work day Sunday 4/19 at 9:30 is Seasonal Bridge Install Day, always very gratifying.   We need at least 16 people, a minimum of 8 for each location.  Please join us.